Nature protection is a top priority at EVN

In the choice, design and construction of plant locations and power lines, we take into consideration:

  • Fauna
  • Flora
  • Natural habitats (= living spaces of animals and plants)

The planning and realisation of construction projects are carried out with as much prudence as the operation of the facilities.

This means:
 

  • Minimisation of resource consumption and land use
  • Minimisation of any interference or damage to the landscape
  • Minimisation of energy losses in the power generation and transmission processes
     
Specific measures:

  • Replacement of overhead lines with underground cables, where this is technically and economically feasible
  • Use of overhead line masts which harmonise with the landscape with regard to their height and colour
  • Ongoing modernisation of the gas network
  • Line laying by means of ploughing as an alternative to excavation
  • Intensive recultivation measures

Specific projects:

  • Environmental compatibility assessment for the 380 kV Etzersdorf-Theiß transmission line
  • EU LIFE project to protect the great bustard
  • Crossing of the Schwechatbach conservation area

Current information and projects concerning the sustainable protection of species and landscape can be found in the EVN Sustainability Report 2007/08.


Status: October 2008